You carry the most risk.
You deserve the best information.
Contractors carry the physical and legal liability for everything built. AxioGlobe is being designed as the information policy that costs less than one hour of rework — giving you the right drawing, the right spec, and the right delivery at the right time.
AxioGlobe is currently in pre-build technical design — nothing below is live yet.
Where we are today: AxioGlobe is a solo-founder project in pre-build technical design. Every feature described below is clearly labeled as planned. Nothing on this page is currently deployed or available to use. Join the waitlist to be notified when beta access opens.
What AxioGlobe is being built to do for youPLANNED
Ten tools designed around the real operational problems contractors face on site every day — drawing changes, delivery confusion, variation disputes, defect documentation, and safety compliance. Each tool is separate, specific, and solves one problem completely.
Live drawing alert systemPlanned
The intended design: every time an architect makes a change to the model, the affected trade contractor receives a push notification within seconds — not a weekly drawing issue, not an email buried in an inbox. A specific alert telling you exactly what changed, on which floor, in which zone.
Safety brief generatorPlanned
The design goal: a daily safety brief delivered to every operative's phone by 06:00, generated automatically from the actual products being installed that day — not a generic RAMS document that covers everything and therefore nothing. Every brief references the specific product, its specific weight, its specific PPE requirements.
Variation capture toolPlanned
The intended design: every time the architect modifies an element in the model, AxioGlobe detects whether that change represents additional scope for the contractor. If it does, a variation notice is automatically drafted — with the scope description, the quantity from the model, and a cost field for the contractor to complete.
Material delivery trackerPlanned
The design: a GPS delivery tracker purpose-built for construction site materials (planned). The moment a manufacturer dispatches an order, the vehicle appears on a live map — showing the driver name, vehicle registration, real-time ETA, and the full product manifest — all visible on your phone before the truck reaches the gate.
Subcontractor sequencing toolPlanned
The design: trade sequencing generated automatically from the construction programme and model — showing each subcontractor exactly which floor, which zone, and which element sequence is ready for them, based on what preceding trades have completed and signed off.
Defect documentation toolPlanned
The design: when a defect is found, scan the QR code on the element or nearby. AxioGlobe links the defect automatically to the model element, the installer record, the delivery record, and the product specification. The responsibility chain is established without argument.
Concrete pour managerPlanned
The design: every concrete pour is logged against the model element — date, time, mix design, volume, batch numbers, cube sample references, and curing conditions. Cube test results are linked to the pour when they arrive from the lab.
Snag list generatorPlanned
The design: snag items are logged by scanning the QR code on any element, adding a photo description, and assigning it to the responsible trade. All snags are linked to the model element — so the snag list is organised by floor, zone, and trade automatically, not by whoever typed it in.
As-built model updaterPlanned
The design: contractors log deviations from the design model as they occur — a wall moved 50mm, a pipe relocated around an obstruction, a beam deepened for revised loading. Each deviation is recorded against the model element with the reason, the approver, and the new dimension.
Site waste trackerPlanned
The design: every waste skip load is logged by type, weight, and disposal route — linked to the model elements that generated it. Waste diversion rates are calculated automatically. BREEAM and LEED waste credit documentation is produced from the log with no additional manual reporting.
The live delivery tracker — how it's designed to workPLANNED
GPS delivery tracking purpose-built for construction (planned). Both the contractor and the manufacturer will see the same map simultaneously — from dispatch to site acceptance.
What's also planned at project completionPLANNED
Every AxioGlobe project is designed to produce a complete digital handover package automatically — from the data logged during construction, with no additional reporting work.
Complete COBie asset register from the model
Every component has a UUID matching the QR code. Warranty and maintenance schedules built in before construction begins — no manual tagging list at the end.
FM-Mode — GPU 3-flag view for facility managers
An ArchiCAD site-disappears view showing only actionable assets, with live badges for flow rate, predicted service dates, and PDF manual links.
As-built model with all deviations recorded
What was actually built vs what was designed — every deviation logged, approved, and attached to the model element during construction.
Verified waste and carbon data
BREEAM, LEED, and ESG waste diversion data produced from site logs automatically. No separate reporting, no manual collation at practical completion.
Your site without AxioGlobe vs with it
The pricing model we're building towardPLANNED
AxioGlobe is in pre-build technical design. The tiers below reflect the intended pricing model. Join the waitlist to be notified when these become available and to lock in early-access pricing.
The cost of one rework incident
funds three years of AxioGlobe.
The average rework incident from a superseded drawing costs £8,000+. AxioGlobe Starter is £3,000 per year. The maths is straightforward — and we haven't started billing yet.
Join the waitlistNo credit card required · Early access for waitlist members · AxioGlobe (PTY) Ltd · Reg: 2026/437531/07
Every custom element — fully specified before it arrives on sitePLANNED
When a custom element is designed in ArchiCAD and fabricated through AxiForge — your contractor dashboard receives the complete installation specification before the element leaves the factory.
Exact fixing specification for every custom element. Type, size, quantity, spacing, torque setting, tool required. Every screw. Every bolt. Every anchor. Generated automatically from the ArchiCAD model and structural data.
Which trade installs this element. Minimum skill level required — CETA grade, NVQ level. Minimum team size. Estimated installation time per unit and total. Programme allowance recommended.
Step-by-step installation instructions in plain language. Generated for every custom element. What goes first. What sequence. What inspection points. What sign-off is required before moving to the next step.
Scan the QR code on every element when it arrives. App shows what it should be. Photo from fabricator QC. Critical dimensions to verify. Digital acceptance creates a timestamped legal record. Reject digitally before it is unloaded.
Every custom element arrives with a tolerance-aware brief. Design dimension, fabrication tolerance, construction tolerance — all reconciled before fabrication. The element fits first time or the conflict was flagged weeks before delivery.
Installation labour cost per element. Total fixing material cost. Days in programme. All visible in your contractor dashboard before the element arrives. No surprises. No undiscovered costs. No variation disputes about scope you should have known.
You carry the most risk.
You deserve the best information.
Contractors carry the physical and legal liability for everything built. AxioGlobe is being designed as the information policy that costs less than one hour of rework — giving you the right drawing, the right spec, and the right delivery at the right time.
AxioGlobe is currently in pre-build technical design — nothing below is live yet.
Where we are today: AxioGlobe is a solo-founder project in pre-build technical design. Every feature described below is clearly labeled as planned. Nothing on this page is currently deployed or available to use. Join the waitlist to be notified when beta access opens.
What AxioGlobe is being built to do for youPLANNED
Ten tools designed around the real operational problems contractors face on site every day — drawing changes, delivery confusion, variation disputes, defect documentation, and safety compliance. Each tool is separate, specific, and solves one problem completely.
Live drawing alert systemPlanned
The intended design: every time an architect makes a change to the model, the affected trade contractor receives a push notification within seconds — not a weekly drawing issue, not an email buried in an inbox. A specific alert telling you exactly what changed, on which floor, in which zone.
Safety brief generatorPlanned
The design goal: a daily safety brief delivered to every operative's phone by 06:00, generated automatically from the actual products being installed that day — not a generic RAMS document that covers everything and therefore nothing. Every brief references the specific product, its specific weight, its specific PPE requirements.
Variation capture toolPlanned
The intended design: every time the architect modifies an element in the model, AxioGlobe detects whether that change represents additional scope for the contractor. If it does, a variation notice is automatically drafted — with the scope description, the quantity from the model, and a cost field for the contractor to complete.
Material delivery trackerPlanned
The design: a GPS delivery tracker purpose-built for construction site materials (planned). The moment a manufacturer dispatches an order, the vehicle appears on a live map — showing the driver name, vehicle registration, real-time ETA, and the full product manifest — all visible on your phone before the truck reaches the gate.
Subcontractor sequencing toolPlanned
The design: trade sequencing generated automatically from the construction programme and model — showing each subcontractor exactly which floor, which zone, and which element sequence is ready for them, based on what preceding trades have completed and signed off.
Defect documentation toolPlanned
The design: when a defect is found, scan the QR code on the element or nearby. AxioGlobe links the defect automatically to the model element, the installer record, the delivery record, and the product specification. The responsibility chain is established without argument.
Concrete pour managerPlanned
The design: every concrete pour is logged against the model element — date, time, mix design, volume, batch numbers, cube sample references, and curing conditions. Cube test results are linked to the pour when they arrive from the lab.
Snag list generatorPlanned
The design: snag items are logged by scanning the QR code on any element, adding a photo description, and assigning it to the responsible trade. All snags are linked to the model element — so the snag list is organised by floor, zone, and trade automatically, not by whoever typed it in.
As-built model updaterPlanned
The design: contractors log deviations from the design model as they occur — a wall moved 50mm, a pipe relocated around an obstruction, a beam deepened for revised loading. Each deviation is recorded against the model element with the reason, the approver, and the new dimension.
Site waste trackerPlanned
The design: every waste skip load is logged by type, weight, and disposal route — linked to the model elements that generated it. Waste diversion rates are calculated automatically. BREEAM and LEED waste credit documentation is produced from the log with no additional manual reporting.
The live delivery tracker — how it's designed to workPLANNED
GPS delivery tracking purpose-built for construction (planned). Both the contractor and the manufacturer will see the same map simultaneously — from dispatch to site acceptance.
What's also planned at project completionPLANNED
Every AxioGlobe project is designed to produce a complete digital handover package automatically — from the data logged during construction, with no additional reporting work.
Complete COBie asset register from the model
Every component has a UUID matching the QR code. Warranty and maintenance schedules built in before construction begins — no manual tagging list at the end.
FM-Mode — GPU 3-flag view for facility managers
An ArchiCAD site-disappears view showing only actionable assets, with live badges for flow rate, predicted service dates, and PDF manual links.
As-built model with all deviations recorded
What was actually built vs what was designed — every deviation logged, approved, and attached to the model element during construction.
Verified waste and carbon data
BREEAM, LEED, and ESG waste diversion data produced from site logs automatically. No separate reporting, no manual collation at practical completion.
Your site without AxioGlobe vs with it
The pricing model we're building towardPLANNED
AxioGlobe is in pre-build technical design. The tiers below reflect the intended pricing model. Join the waitlist to be notified when these become available and to lock in early-access pricing.
The cost of one rework incident
funds three years of AxioGlobe.
The average rework incident from a superseded drawing costs £8,000+. AxioGlobe Starter is £3,000 per year. The maths is straightforward — and we haven't started billing yet.
Join the waitlistNo credit card required · Early access for waitlist members · AxioGlobe (PTY) Ltd · Reg: 2026/437531/07
Every custom element — fully specified before it arrives on sitePLANNED
When a custom element is designed in ArchiCAD and fabricated through AxiForge — your contractor dashboard receives the complete installation specification before the element leaves the factory.
Exact fixing specification for every custom element. Type, size, quantity, spacing, torque setting, tool required. Every screw. Every bolt. Every anchor. Generated automatically from the ArchiCAD model and structural data.
Which trade installs this element. Minimum skill level required — CETA grade, NVQ level. Minimum team size. Estimated installation time per unit and total. Programme allowance recommended.
Step-by-step installation instructions in plain language. Generated for every custom element. What goes first. What sequence. What inspection points. What sign-off is required before moving to the next step.
Scan the QR code on every element when it arrives. App shows what it should be. Photo from fabricator QC. Critical dimensions to verify. Digital acceptance creates a timestamped legal record. Reject digitally before it is unloaded.
Every custom element arrives with a tolerance-aware brief. Design dimension, fabrication tolerance, construction tolerance — all reconciled before fabrication. The element fits first time or the conflict was flagged weeks before delivery.
Installation labour cost per element. Total fixing material cost. Days in programme. All visible in your contractor dashboard before the element arrives. No surprises. No undiscovered costs. No variation disputes about scope you should have known.